Reimagining Howard Street:

A Downtown Boone Transformation

Howard Street is on the verge of an exciting transformation—a long-awaited revitalization project that will bring a more pedestrian-friendly, bike-accessible, and vibrant downtown corridor. With construction set to begin, this initiative represents a major investment in Boone’s infrastructure, quality of life, and future economic growth. For decades, Howard Street has been a beloved yet underutilized part of our downtown. With this revitalization project, we are creating a street that prioritizes safety, accessibility, and sustainability while enhancing the charm and character that make Boone so special.

What’s Coming to Howard Street?

This ambitious project will reshape Howard Street into a welcoming, modern, and efficient space. Key improvements include:

A Walkable, Bikeable Future

  1. A new pedestrian path and dedicated bike lane will make it easier than ever to explore downtown Boone without a car.
  2. Safer street crossings, ADA-accessible tactile surfaces, and widened sidewalks will create a more inclusive environment for all.

Smarter, Safer Streets

  1. Howard Street will be converted to a one-way traffic flow, easing congestion and improving safety for pedestrians, cyclists, and drivers alike.
  2. New street lighting and electrical upgrades will enhance safety and functionality for businesses, visitors, and residents.

A Greener, More Beautiful Downtown

  1. Over 8,500 square feet of new brick hardscaping, landscaping, and plantings will add natural beauty to the area.
  2. Tree grates and guards will ensure that our urban canopy continues to thrive, reinforcing Boone’s dedication to green space.

Modernizing Infrastructure

  1. Over 1,500 feet of new water mains and 1,200 feet of upgraded sewer mains will enhance Boone’s infrastructure for years to come.
  2. Improved storm-water management with nearly 1,400 feet of new piping and 36 inlets and manholes will prevent flooding and improve drainage.

Powering the Future

  1. Electrical upgrades will include major overhead-to-underground utility relocations, enhancing the street’s aesthetics while improving reliability.
  2. Conduit for future electric vehicle (EV) chargers will be installed, making Boone more EV-friendly as we move toward a more sustainable future.

A Stronger Future for Businesses & Development

Beyond just fixing old pipes, these upgrades make Howard Street ripe for future development and provide greater stability for existing businesses. A modernized infrastructure means:
  1. Fewer service disruptions for water, sewer, and power, keeping businesses running smoothly.
  2. Increased investment potential, as developers and entrepreneurs will be drawn to an area with strong, up-to-date utilities.
  3. A downtown built for long-term success, ensuring that Boone’s core remains a thriving hub for commerce, culture, and community.

A Commitment to Community

We know how important Howard Street is to Boone’s vibrant downtown culture, which is why this project has been designed with minimal disruption in mind. Work will pause for key community events, ensuring that the heart of our town remains open and accessible for celebrations, tailgates, and gatherings. This project isn’t just about fixing roads—it’s about reimagining the future of Downtown Boone. A safer, more beautiful, and more accessible Howard Street will benefit local businesses, residents, students, and visitors for generations to come. With 450 days of work ahead, we ask for patience and support as we build something truly transformative for Boone. By investing in our infrastructure today, we are shaping a stronger, more connected, and more resilient downtown for tomorrow. This revitalization isn’t just about the present—it’s about building a downtown that can grow and thrive for generations to come.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.