Crews made solid progress on underground infrastructure work along Howard Street, including:

  • Storm drainage system
    • 164 linear feet of 15-inch reinforced concrete pipe (RCP)
    • 77 linear feet of 16-inch ductile iron pipe (DIP)
    • Installation of four storm boxes
  • Water line
    • 140 linear feet of 8-inch ductile iron pipe (DIP)

Much of this work takes place below ground and may not be immediately visible, but it represents meaningful progress toward improving long-term drainage, water service, and overall infrastructure along Howard Street.

This Week
Crews will resume work on water line installation in the area behind the Appalachian Theatre. This portion of the project has been moving efficiently, though there may be short periods of temporary parking impacts during the day. Access is typically restored in the evenings. Work will continue progressing toward Depot Street.and overall infrastructure along Howard Street.